Forrest Centre
Designing an Efficient Future
About the Project
Replacing the aging power distribution system in this multi-storey building was a priority following numerous equipment failures. We delivered a solution that was both economical and future-ready, incorporating a flexible and reliable distribution control system.
Considerations
Working with live power whilst installing new electrical services can be a challenge. We achieved this and delivered a new rising bus duct distribution system and emergency power system.
The Scope of Works
Working on education projects requires safe, smart and intuitive thinking. We worked with the Forrest Centre to install and maintain two 1000A rising busduct systems, main switchboards and essential power controls, associated building works, and communications and energy management systems.